Burlington drops the drawings requirement for backwater valve and sump pump permits; permit fees stay waived
Homeowners and contractors applying for flood-prevention plumbing permits in Burlington now fill out a one-page form instead of submitting drawings, the City says. Its fee grant still covers the building permit fee for eligible work.
The update
- A one-page supplemental form replaces drawings for permits to install a backwater valve or sump pump, or to repair or replace a sanitary sewer line when a backwater valve is also installed.
- The City's Plumbing Permit Fee Grant Program still covers the building permit fee for that work; the City says $644,000 in fees have been waived since the 2014 flood.
- The City's release says the change starts November 27; its flood-prevention page says the new form is effective November 30, 2026.
Why it matters. Burlington homeowners who want to protect a basement from sewer backups can now get the permit with less paperwork and, for eligible work, without paying the permit fee.
What changed
The City of Burlington said on November 27 that homeowners and contractors applying for permits for eligible flood-prevention plumbing work will have a simpler application process. A new one-page supplemental form replaces the requirement to submit drawings. The City said the change comes as Burlington continues to experience significant rainfall events.
It matters for any homeowner thinking about protecting a basement before the next heavy storm: the work most often recommended against sewer backups, a backwater valve or a sump pump, needs a building permit, and the drawings were part of the paperwork. The City said it coordinated with the other Halton municipalities to align application requirements, so the process is meant to be the same across the region.
- Backwater valve
- Installation
- Sump pump
- Installation
- Sanitary sewer line
- Repair or replacement, only when a backwater valve is also installed
- What replaces the drawings
- A one-page supplemental form
- Permit fee
- Covered for eligible homeowners through the Plumbing Permit Fee Grant Program
The permit fee grant
The change builds on the City's Plumbing Permit Fee Grant Program, which it has offered since the 2014 flood. According to the City's flood-prevention page, the program is available to owners of existing single-family dwellings in Burlington and covers the building permit fee for the same three types of work. The City says $644,000 in fees have been waived since 2014.
The program page says applicants may be the homeowner, a plumber or a contractor, and that a plumber or contractor may apply on the owner's behalf. Applications go to the Building Department by email using the City's Flood Prevention application package. Where applicable, devices and materials must have a current CCMC Evaluation Listing, and the City may ask for product specifications, site plans or manufacturer information.
Other help with flood risk
- Home Flood Protection Program: the City covers up to 50 per cent of an assessment by a trained third-party assessor; subsidized in-person assessments cost $285 plus HST and virtual ones $240 plus HST, with 20 available each year, according to the City's page.
- Halton Region's Enhanced Basement Flooding Prevention Subsidy Program offers subsidies for backwater valves, downspout and weeping tile disconnection, sump pumps, sewer lateral lining and repair, and exterior storm drain disconnection.
- Halton Region's Household Drainage Survey is an in-home assessment for homes that meet the Region's criteria; residents can email the Region or call 311 to check eligibility.
The date
Dates as this story states them, each traced to its sources.
Spotted an error? We keep the URL, update the timestamp and record the change. Our corrections policy.