Skip to content

Transit

Status: Open for comment. A consultation, public meeting or appeal window is open now.

Halton studies the Appleby Line and No. 2 Side Road intersection in Burlington, and wants comments by Nov. 30

Halton Region has launched a Municipal Class Environmental Assessment of the Appleby Line (Regional Road 20) and No. 2 Side Road intersection in Burlington, and is taking public input through an online Public Information Centre until November 30, 2026.

BurlingtonIQ Newsroom2 sources · 3 min read

Email

What’s next: Closes November 30, 2026

The details

The study

Halton Region has begun a Municipal Class Environmental Assessment of the intersection of Appleby Line (Regional Road 20) and No. 2 Side Road in Burlington. According to the Region's project page, the aim is to identify long-term improvements to support overall operation of the intersection, and the study will examine a range of options before any design is settled.

Halton Region will examine a wide range of alternatives including intersection treatment alternatives.
Halton Region, Appleby Line and No. 2 Side Road MCEA Study page

The study follows the Municipal Class Environmental Assessment process, under which a public body must look at alternatives, weigh their effects on the social, cultural and natural environment, and consult the public before it commits to a plan. The consultant carrying out the work is CIMA Canada Inc. The project page lists the study's status as on-going and does not yet name a preferred option.

How to take part

The Region is holding its first Public Information Centre online rather than as a single in-person meeting. The online Public Information Centre runs from November 9 to 30, 2026, and residents are asked to review the material and submit comments by November 30. Input can be made through an online survey linked from the project page or sent by email to Appleby2SRMCEA@halton.ca, the project's contact address.

Appleby Line and No. 2 Side Road MCEA study (Halton Region project page, read Nov. 9, 2026)
Location
Appleby Line (Regional Road 20) and No. 2 Side Road intersection, City of Burlington
Type
Municipal Class Environmental Assessment study
Status
On-going
Consultant
CIMA Canada Inc.
Study began
Notice of Commencement, March 2026
Public Information Centre #1
Online, November 9–30, 2026
Comment deadline
November 30, 2026
Project contact
Appleby2SRMCEA@halton.ca

Where it stands

The Region opened the study with a Notice of Commencement in March 2026 and has now published a Notice of Public Information Centre #1 dated November 2026. The project page sets out how to comment and the November 30 deadline, but it does not post a problem-or-opportunity statement explaining the specific traffic concerns, say which Class EA schedule the study follows, or describe the steps that come after this first round of consultation. Those details, where the Region has set them, are in the notice itself and can be confirmed through the project contact.

Update, November 9: the Region's notice

The Region's media release for the notice, dated November 9, is now online and fills in two points the project page left open. It says the study is being carried out under Schedule C of the Municipal Class Environmental Assessment, and that this first Public Information Centre presents the problem-or-opportunity statement, the alternative solutions, a recommended solution, the design concepts being considered and the next steps. The release does not describe the recommended solution itself; the online material linked from the project page is where residents can review it before the November 30 deadline.

Residents who want to join the study's mailing list, would rather comment by phone, or need the material in another format can contact the project team at Appleby2SRMCEA@halton.ca, the release says. It lists Jessica Passingham of Halton Region and David Hiett of CIMA+, the consultant, as the project managers.

Sources

Every factual claim above traces to one of these documents.

Spotted an error? We keep the URL, update the timestamp and record the change. Our corrections policy.


Go deeper

All stories